Zapote
Proposed LRT-1 station
Zapote station is a proposed Light Rail Transit (LRT) station located on the LRT Line 1 (LRT-1) system in Bacoor City. The station will be located at the line's Zapote Satellite Depot. Unlike other LRT-1 stations, Zapote station will be constructed at grade. It is part of the LRT-1 South Extension Project. and is expected to be the first LRT-1 station located outside Metro Manila.
| Zapote | |||||||
|---|---|---|---|---|---|---|---|
Aerial view of the site of the Zapote station and satellite depot in 2024
|
|||||||
| General information | |||||||
| Location | Barangay Zapote V, Bacoor, Cavite | ||||||
| Coordinates | 14°28′19″N 120°58′03″E | ||||||
| Owned by |
|
||||||
| Operated by | Light Rail Manila Corporation | ||||||
| Line(s) | LRT Line 1 | ||||||
| Platforms | – | ||||||
| Tracks | 2 | ||||||
| Connections | None | ||||||
| Construction | |||||||
| Structure type | At grade | ||||||
| Parking | – | ||||||
| Bicycle facilities | – | ||||||
| Accessible | – | ||||||
| Other information | |||||||
| Status | Construction not yet to be started | ||||||
| History | |||||||
| Opening | 2031 | ||||||
| Services | |||||||
|
|||||||
Zapote station was first planned as part of the Line 1 South Extension plan, which calls for a mostly elevated extension of approximately 11.7 kilometers. The extension will have 8 passenger stations, with an option for 2 future stations (Manuyo Uno and Talaba). The project was first approved on August 25, 2000, and the implementing agreement was approved on January 22, 2002. However, construction of the extension was repeatedly delayed, and the project was eventually shelved.
Plans for the southern extension were revived as early as 2012 during the Benigno Aquino III administration and were expected to begin construction in 2014, but were delayed due to right of way issues. These issues were resolved in 2016, and the project broke ground on May 4, 2017. Construction work on the south extension began on May 7, 2019 after the right-of-way acquisitions were cleared.
On November 15, 2024, Phase 1 of the LRT Line 1 Extension, which runs between Redemptorist and Dr. Santos, was inaugurated; LRMC management announced that commercial operations would begin on the following day. Phases 2 and 3 are expected to begin operations by 2031, as challenges particularly delays in acquisition of right-of-way have hindered their completion.
| Operational | |
|---|---|
|
Dr. Santos
Ninoy Aquino Asia World MIA Redemptorist Baclaran EDSA Libertad Gil Puyat Vito Cruz Quirino Pedro Gil |
United Nations
Central Carriedo Doroteo Jose Bambang Tayuman Blumentritt Abad Santos R. Papa 5th Avenue Monumento Balintawak |
| Fernando Poe Jr. | |
| Under construction | |
|
Las Piñas
Zapote |
Niog
North Triangle |