Las Piñas
Proposed LRT-1 station
Las Piñas station is a proposed Light Rail Transit (LRT) station located on the LRT Line 1 (LRT-1) system in Las Piñas City. It is part of the LRT-1 South Extension Project. It is one of two proposed LRT-1 stations in Las Piñas, the other being Manuyo Uno.
Las Piñas | |||||||
---|---|---|---|---|---|---|---|
General information | |||||||
Other names | Diego Cera | ||||||
Location | Pulang Lupa Uno, Las Piñas, Metro Manila, Philippines | ||||||
Owned by | Light Rail Transit Authority | ||||||
Operated by | Light Rail Manila Corporation | ||||||
Line(s) | LRT Line 1 | ||||||
Platforms | – | ||||||
Tracks | 2 | ||||||
Connections | None | ||||||
Construction | |||||||
Structure type | Elevated | ||||||
Parking | No | ||||||
Bicycle facilities | – | ||||||
Accessible | – | ||||||
Other information | |||||||
Status | Construction not yet to be started | ||||||
Station code | LP | ||||||
History | |||||||
Opening | 2031 | ||||||
Services | |||||||
|
Las Piñas station was first planned as part of the Line 1 South Extension plan, which calls for a mostly elevated extension of approximately 11.7 kilometers. The extension will have 8 passenger stations with an option for 2 future stations (Manuyo Uno and Talaba). The project was first approved on August 25, 2000, and the implementing agreement for the project was approved on January 22, 2002. However, construction for the extension was repeatedly delayed until the project was shelved years later.
The plans for the southern extension project were restarted as early as 2012 during the Aquino administration and was expected to begin construction in 2014, but was delayed due to right of way issues. The issues were resolved in 2016 and the project broke ground on May 4, 2017. Meanwhile, construction works on the south extension began on May 7, 2019, after the right of way acquisitions were cleared.
On November 15, 2024, Phase 1 of the LRT Line 1 Extension, which runs between Redemptorist and Dr. Santos, was inaugurated; the LRMC management announced the start of its commercial operations to be on the following day. Meanwhile, Phases 2 and 3 will begin operations by 2031 as challenges hindered their completion with the delays in the acquisition of right of way.
Operational | |
---|---|
Dr. Santos
Ninoy Aquino Asia World MIA Redemptorist Baclaran EDSA Libertad Gil Puyat Vito Cruz Quirino Pedro Gil |
United Nations
Central Carriedo Doroteo Jose Bambang Tayuman Blumentritt Abad Santos R. Papa 5th Avenue Monumento Balintawak |
Fernando Poe Jr. | |
Under construction | |
Las Piñas
Zapote |
Niog
North Triangle |